Hotel Renovates Heating for Reopening After Lockdown

   Kompozit’all UK were asked to advise on the repair of Hoar Cross Hall’s chimney for their heating boilers. The boiler system is integral for the running of this premises: heating the swimming pool, heating the rooms, running hot water etc. so the urgency of the situation was heightened. Kompozit’all UK joined with their … Continue reading Hotel Renovates Heating for Reopening After Lockdown